Project Description

Client
NHS Property Service and Waltham Forest and East London (WEL) CCG

Project Name
Sutton Wharf Health Centre

Duration
41 Weeks

Value
£2,000,000

Contract Administrator:
Ridge and Partners Ltd

Quantity Surveyor:
Ridge and Partners Ltd

Architect:
Monahan Blythen Hopkins Architects

Principal Designer:
Monahan Blythen Hopkins Architects

M&E Engineers:
Ridge and Partners Ltd

Description
This development was in response to population growth, stimulated by the new residential development at Titanium Point in Bethnal Green which was driving increased demand for healthcare provision in the Locality.

The project involved the Design and Build shell fit-out of the 920m² Sutton Wharf Health Centre on the ground floor of Titanium Point in Bethnal Green on behalf of NHS Property Services and WEL CCG for the Globe Town Surgery to relocate to.

Sutton Wharf Health Centre provides 12 consulting rooms and 3 treatment rooms, as well as a multi-purpose group room and counselling room. Two of the consulting rooms will be dedicated GP training rooms.

The work involved alteration works to form external walls to the shell building, internal partitions, installation of structural steelwork, drainage, new connections to existing new basement level plant room, mechanical and electrical installation including connection to a district heating system as well as the installation of fixtures, fittings, and finishes.