Client
Our Lady of the Visitation
Catholic Primary School

Project Name
School Hall and Roof
Replacement (Phase 2)

Duration
12 Weeks

Value

Contract Administrator:
DHP (UK) LLP

Architect:
DHP (UK) LLP

Quantity Surveyor:
DHP (UK) LLP

M&E Consultant:
DHP (UK) LLP

Structural Engineer:
DHP (UK) LLP

Download PDF versionDescription

The work consisted of renewal of the existing roof coverings for area agreed in phase 2 of works and prepared to receive a new insulated Bauder felt roof covering system including all associated works lead detail, abutment adjustments and flashings. A new uPVC fascia system was also installed to each roof area with a new guttering detail and new rainwater goods. Internal redecoration and new lighting in the school hall.

This work was undertaken in a live school environment which meant that student safety was a priority as was the need to minimise disruption to staff and students from noise, dust and vibration.

Testimonial

We are a primary school in Greenford London. Storm building completed repairs to our roof and hall which included redecoration and installation of new lights. We were very impressed with the whole process. From the pre works meeting through to completion Storm and project manager were always professional and flexible.

Part of the works needed to be completed during school time and Storm were always mindful of the environment in which they were working and the young children in the vicinity. Safeguarding was given careful consideration and the needs of the school were always put first.

The school was consulted about any necessary changes. The site manager was very easy to work with and ensured that the school was left tidy at the end of every day. We were extremely impressed with the completed works which are of a very high standard.

Kathleen Coll,
Headteacher